AISJ SCHOOL WALL
PROJECT DESCRIPTION
This project is about developing and rehabilitating this wall after it was left without use for several years.
The director of physical education contacted us.
We dismantled and refurbished all the elements of this wall, including the climbing holds, added new climbing holds made of PE and PU in Taj Climbing factory, and rearranged the climbing routes to suit all ages and students of the school by allocating nine different levels, including three TruBlue auto belays.
This school climbing wall features overhanging sections of up to 0.65 m and articulated safety matting below.
PROJECT STATISTICS​
PROJECT LOCATION
PROJECT PROFILE
Wall Type
Rop Top Wall
Maximum Height
7.6M
Total Width
10M
Climbable Area
76 m²
Route Setting
9 Lines 3 overhangs
Build Date
2021-10-21
Climber profile
Number of Auto Belay
3 Tru Blue
Owned by
American International School of Jeddah
JEDDAH - ALMHAMADIA
City & Dist.
Beginners to Advanced