top of page

AISJ SCHOOL WALL

PROJECT DESCRIPTION

This project is about developing and rehabilitating this wall after it was left without use for several years.
The director of physical education contacted us.
We dismantled and refurbished all the elements of this wall, including the climbing holds, added new climbing holds made of PE and PU in Taj Climbing factory, and rearranged the climbing routes to suit all ages and students of the school by allocating nine different levels, including three TruBlue auto belays.
This school climbing wall features overhanging sections of up to 0.65 m and articulated safety matting below.

PROJECT STATISTICS​

PROJECT LOCATION

PROJECT PROFILE

Wall Type

Rop Top Wall

Maximum Height

7.6M

Total Width

10M

Climbable Area

76 m²

Route Setting

9 Lines 3 overhangs

Build Date

2021-10-21

Climber profile

Number of Auto Belay

3 Tru Blue

Owned by

American International School of Jeddah

JEDDAH - ALMHAMADIA

City & Dist.

Beginners to Advanced

bottom of page